PH Construction Calculator

Based on Fajardo's Simplified Construction Estimate, 3rd Ed.

🧱
CHB / Masonry
Blocks, mortar, cement, sand
πŸ—οΈ
Concrete Mix
Cement, sand, gravel per cu.m.
βš™οΈ
Rebar
Pieces, weight, cutting lengths
πŸͺ£
Plastering
Cement & sand for wall plaster
πŸͺœ
Stair / Ramp
PD 1096 & BP344 compliant
🎨
Paint
Coverage, coats, gallons needed
πŸ”²
Tile / Flooring
Tiles, adhesive, grout
πŸͺ΅
Board Feet
Lumber computation
πŸ“
Unit Converter
Construction conversions
🧱 CHB / Masonry Estimator
Compute CHB pieces, mortar, cement & sand per wall
Please fill in Wall Length and Wall Height.
Opening Deductions
Ref: Fajardo Table 1-7 (CHB per sq.m.)
Standard door: 0.90Γ—2.10m = 1.89 sq.m. | Window: 1.20Γ—1.20m = 1.44 sq.m.
πŸ—οΈ Concrete Mix Estimator
Cement, sand & gravel per volume of concrete
Please fill in the Volume of Concrete.
Ref: Fajardo Table 1-3 (Concrete Proportions)
βš™οΈ Rebar Calculator
Pieces, weight & total length of reinforcing bars
Please fill in Total Length Needed.
Unit weight: kg/m = dΒ²/162 (standard formula)
πŸͺ£ Plastering Estimator
Cement & sand for interior/exterior wall plastering
Please fill in Wall Length and Wall Height.
Opening Deductions
Ref: Fajardo (Plastering Works)
Cement density: 1,440 kg/cu.m. | Standard bag: 40kg
πŸͺœ Stair / Ramp Calculator
PD 1096 Rule VII & VIII, BP344
Please fill in the required fields.
Ref: PD 1096 Rule VII (Stairs), BP344 (Accessibility/Ramps)
🎨 Paint Estimator
Compute gallons needed for walls & ceilings
Please fill in Surface Area.
Coverage based on typical Philippine paint brands
πŸ”² Tile / Flooring Estimator
Number of tiles, adhesive & grout needed
Please fill in Floor/Wall Area.
Adhesive: ~5kg/sq.m. | Grout: ~0.5kg/sq.m. (typical)
πŸͺ΅ Board Feet Calculator
Lumber computation β€” board feet & total cost
Please fill in Thickness, Width, and Length.
BF = (T Γ— W Γ— L) / 12 β€” standard board feet formula
πŸ“ Unit Converter
Construction-specific unit conversions